Skip to main content
CaptainsGround

46 CFR §176.702

46 CFR Part 176

TL;DR

§ 176.702 § 176.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial inspection for certific

§ 176.702 § 176.702 Installation tests and inspections. Whenever a launching appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial inspection for certification of the vessel, as replacement equipment or as a new installation, the owner or managing operator shall conduct the tests and make the vessel ready for the inspections required by § 176.402(d) to the satisfaction of the cognizant OCMI.


Test your knowledge

Drill questions on this rule are available to signed-in users.

Sign up free
46 CFR §176.702 — Captain's Exam Prep · CaptainsGround