Skip to main content
CaptainsGround

-5 -5 Construction and testing of generators

The exact 46 CFR §111.12-5 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

Each generator must meet the applicable requirements for construction and testing in section 4-8-3 of the ABS Marine Vessel Rules (incorporated by reference; see § 110.10-1 of this subchapter) except that each one for a mobile offshore drilling unit must meet the requirements in section 6-1-7 of the ABS MOU Rules (incorporated by reference; see § 110.10-1 of this subchapter).

Section 111.12-5 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

Each generator must meet the applicable requirements for construction and testing in section 4-8-3 of the ABS Marine Vessel Rules (incorporated by reference; see § 110.10-1 of this subchapter) except that each one for a mobile offshore drilling unit must meet the requirements in section 6-1-7 of the ABS MOU Rules (incorporated by reference; see § 110.10-1 of this subchapter). [USCG-2020-0075, 88 FR 16360, Mar. 16, 2023]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §111.12-5 — -5 -5 Construction and testing of generators · CaptainsGround