-7 -7 Alarms and shutdowns

The exact 46 CFR §111.33-7 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

Each power semiconductor converter must have a high temperature alarm or shutdown, except as provided in § 111.33-11.

Section 111.33-7 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

Each power semiconductor converter must have a high temperature alarm or shutdown, except as provided in § 111.33-11. [CGD 74-125A, 47 FR 15236, Apr. 8, 1982, as amended by USCG-2020-0075, 88 FR 16362, Mar. 16, 2023]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §111.33-7 — -7 -7 Alarms and shutdowns · CaptainsGround