Skip to main content
CaptainsGround

Drainage of well deck vessels

The exact 46 CFR §178.430 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

(a) The weather deck on a well deck vessel must be watertight.

Section 178.430 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

(a)The weather deck on a well deck vessel must be watertight.

(b)The area required on a well deck vessel for drainage of well formed by the bulwarks shall be determined by § 178.450.

(c)The freeing ports or scuppers on a well deck vessel must be located to allow rapid clearing of water in all probable conditions of list and trim.

(d)The deck of well deck vessel that operates on exposed or partially protected waters must be at least 255 millimeters (10 inches) above the deepest load waterline unless the vessel complies with:

(1)The intact stability requirements of §§ 170.170, 170.173, 171.050, 171.055, and 171.057 in subchapter S of this chapter;

(2)The Type II subdivision requirements in §§ 171.070, 171.072, and 171.073 in subchapter S of this chapter; and

(3)The damage stability requirements in § 171.080 in subchapter S of this chapter.

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §178.430 — Drainage of well deck vessels · CaptainsGround