Skip to main content
CaptainsGround

Intent

The exact 46 CFR §182.100 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for t

Section 182.100 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

This part contains requirements for the design, construction, installation, and operation of propulsion and auxiliary machinery, piping and pressure systems, steering apparatus, and associated safety systems. Machinery and equipment installed on each vessel must be suitable for the vessel and its operation and for the purpose intended. All machinery and equipment must be installed and maintained in such a manner as to afford adequate protection from causing fire, explosion, machinery failure, and personnel injury.

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §182.100 — Intent · CaptainsGround