Skip to main content
CaptainsGround

Installations

The exact 46 CFR §182.220 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

(a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part.

Section 182.220 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

(a)Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part.

(b)The requirements for machinery and boilers for steam and electrically propelled vessels are contained in applicable regulations in subchapter F (Marine Engineering) and subchapter J (Electrical Engineering) of this chapter.

(c)Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and is subject to such requirements as determined necessary by the cognizant OCMI. These unusual types of propulsion machinery include:

(1)Gas turbine machinery installations;

(2)Air screws;

(3)Hydraulic jets; and

(4)Machinery installations using lift devices.

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §182.220 — Installations · CaptainsGround