Skip to main content
CaptainsGround

-10 -10 Preheating

The exact 46 CFR §56.85-10 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

The minimum welding preheat procedures and temperatures must be as stated in section 131 and Table 131.4.1 of ASME B31.1 (incorporated by reference; see § 56.01-2).

Section 56.85-10 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

The minimum welding preheat procedures and temperatures must be as stated in section 131 and Table 131.4.1 of ASME B31.1 (incorporated by reference; see § 56.01-2). [CGFR 68-82, 33 FR 18843, Dec. 18, 1968, as amended by CGFR 69-127, 35 FR 9980, June 17, 1970; CGD 72-104R, 37 FR 14234, July 18, 1972; CGD 72-206R, 38 FR 17229, June 29, 1973; CGD 73-254, 40 FR 40166, Sept. 2, 1975; CGD 77-140, 54 FR 40615, Oct. 2, 1989; USCG-2003-16630, 73 FR 65185, Oct. 31, 2008]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §56.85-10 — -10 -10 Preheating · CaptainsGround