-25 -25 Preparation for testing (modifies 137.2)

The exact 46 CFR §56.97-25 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

(a)All joints including welds must be left uninsulated and exposed for examination during the test.

Section 56.97-25 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

(a)All joints including welds must be left uninsulated and exposed for examination during the test. (b)Piping systems designed for vapor or gas may be provided with additional temporary supports, if necessary. (c)Expansion joints must be provided with temporary restraint, if required for the additional pressure load under test. (d)Equipment that is not to be subjected to the pressure test must be isolated by a blank flange or equivalent means. (e)Flanged joints at which blinds are inserted to blank off other equipment during the test need not be tested. (f)If a pressure test is to be maintained for a period of time and the test medium in the system is subject to thermal expansion, precautions must be taken to avoid excessive pressure. A small relief valve set to 1 1/3 times the test pressure is recommended during the pressure test. [CGD 73-254, 40 FR 40167, Sept. 2, 1975]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §56.97-25 — -25 -25 Preparation for testing (modifies 137.2) · CaptainsGround