-38 -38 Initial service leak test (modifies 137.7)

The exact 46 CFR §56.97-38 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

(b) The piping system must be gradually brought up to design pressure. After inspection of the piping system has proven that the installation is complete and all joints are leak-tight, the piping has met the requirements of § 56.97-1.

Section 56.97-38 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

(a)An initial service leak test and inspection is acceptable when other types of test are not practical or when leak tightness is conveniently demonstrable due to the nature of the service. One example is piping where shut-off valves are not available for isolating a line. Others may be systems for service water, condensate, plant and instrument air, etc., where checking out of pumps and compressors afford ample opportunity for leak tightness inspection prior to full-scale operation.

(b)The piping system must be gradually brought up to design pressure. After inspection of the piping system has proven that the installation is complete and all joints are leak-tight, the piping has met the requirements of § 56.97-1. [CGD 73-254, 40 FR 40168, Sept. 2, 1975]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.