(a)Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:
(1)The purpose of the system.
(2)Its location on the vessel.
(3)The maximum allowable working pressure.
(4)The fluid used in the system.
(5)Details of the system components in accordance with § 56.01-10(d) of this subchapter.