Skip to main content
CaptainsGround

-40 -40 Plans

The exact 46 CFR §58.30-40 text, rendered cleanly with its subsection structure — plus how this rule shows up on the exam.

Public-domain federal text · ingested from eCFR
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

TL;DR

(a) Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:

Section 58.30-40 — full text

Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.

(a)Diagrammatic plans and lists of materials must be submitted for each of the fluid power and control systems listed in § 58.30-1(a) that is installed on the vessel. Plan submission must be in accordance with subpart 50.20 of this subchapter and must include the following:

(1)The purpose of the system.

(2)Its location on the vessel.

(3)The maximum allowable working pressure.

(4)The fluid used in the system.

(5)Details of the system components in accordance with § 56.01-10(d) of this subchapter.

(b)[Reserved]

From regulation to exam

See how this section shows up on the test

Test your knowledge

Try 5 real exam questions on the rules behind this regulation — no sign-up needed.

Was this page helpful?

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

46 CFR §58.30-40 — -40 -40 Plans · CaptainsGround