In conducting hydrostatic tests on piping, the required test pressure must be maintained for a sufficient length of time to permit an inspection to be made of all joints and connections. The setting of the relief valve or safety valve will be considered as establishing the maximum allowable working pressure of the system. [CGFR 68-82, 33 FR 18890, Dec. 18, 1968, as amended by CGD 95-012, 60 FR 48050, Sept. 18, 1995]
TL;DR
In conducting hydrostatic tests on piping, the required test pressure must be maintained for a sufficient length of time to permit an inspection to be made of all joints and connections. The setting of the relief valve or safety valve will be considered as establishing the maximum allowable working pressure of the system.
Section 61.15-1 — full text
Rendered cleanly from the source — the exact regulatory text, with subsection structure preserved.
From regulation to exam
See how this section shows up on the test
Test your knowledge
Try 5 real exam questions on the rules behind this regulation — no sign-up needed.
Was this page helpful?