Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticePlotting with variation and deviation (T-V-M-D-C)

Pre-voyage planning for a towing vessel operating seaward of the U.S. territorial sea baseline requires the master to check the planned route for proximity to hazards before departure. If a substantial deviation from the planned route becomes necessary during the voyage, when must the new route be planned?

  1. Before deviating from the planned routeCorrect
  2. B. Within one hour after the deviation begins
  3. C. At the next scheduled watch change
  4. D. Upon arrival at the next waypoint

Why A is correct

33 CFR §164.80(c)(3) states that if a decision is made to deviate substantially from the planned route during a voyage, the master or mate must plan the new route before deviating from the planned route. This requirement applies when any part of the intended voyage is seaward of the U.S. territorial sea baseline. Accurate application of compass corrections (T-V-M-D-C) to the replanned route is part of the navigational competency required by 33 CFR §164.78(a)(5).

More Plotting with variation and deviation (T-V-M-D-C) questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Pre-voyage planning for a towing vessel operating seaward of the U.… — USCG Exam Practice · CaptainsGround