A watchstander needs to open a valve on a steam line to perform a routine task. Which sequence of verifications is required before opening the valve?

  1. Confirm the line is isolated, depressurized, cooled, and tagged out where requiredCorrect
  2. B. Confirm the line is depressurized and that the watch engineer has been notified
  3. C. Confirm the line is cooled and that hearing protection is worn
  4. D. Confirm the line is tagged out and that a second watchstander is standing by

Why A is correct

NAVEDTRA 14104 §1-2 specifies that before opening any pressurized system, valve, or casing, the watchstander verifies it is isolated, depressurized, cooled, and, where required, tagged out. All four conditions must be confirmed; notification of the watch engineer and a standby watchstander are not listed as the required sequence in the source.

More Watch duties, terminology, and instrumentation questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

A watchstander needs to open a valve on a steam line to perform a r… — USCG Exam Practice · CaptainsGround