USCG Exam PracticeWatch duties, terminology, and instrumentation
Before opening a pressurized system, valve, or casing in the engine room, what conditions must the watchstander verify are met?
- A. The watch engineer has been notified and the bell book has been updated
- ✓ The system is isolated, depressurized, cooled, and, where required, tagged outCorrect
- C. The system is isolated and the engineering log entry has been completed
- D. The bridge has been informed and the throttle has been set to stop
Why B is correct
NAVEDTRA 14104 §1-2 explicitly states that before opening any pressurized system, valve, or casing, the watchstander verifies it is isolated, depressurized, cooled, and, where required, tagged out. Omitting any one of these steps creates a serious injury hazard.
Cited:NAVEDTRA 14104 §1-2