Under 46 CFR §56.50-30, feed piping from the boiler to and including the required stop and stop-check valves must have a design pressure that exceeds the maximum allowable working pressure (MAWP) of the boiler by which amount?

  1. A. 10 percent or 100 psig, whichever is greater
  2. 25 percent or 225 psig, whichever is lessCorrect
  3. C. 25 percent or 225 psig, whichever is greater
  4. D. 10 percent or 150 psig, whichever is less

Why B is correct

46 CFR §56.50-30(a)(3) specifies that feed piping from the boiler, to and including the required stop and stop-check valves, must have a design pressure exceeding the boiler MAWP by either 25 percent or 225 psig, whichever is less. This is a specific regulatory value that must not be confused with the greater-of or different-percentage alternatives. (46 CFR §56.50-30)

More Boiler and steam propulsion fundamentals questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Under 46 CFR §56.50-30, feed piping from the boiler to and includin… — USCG Exam Practice · CaptainsGround