Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticeMaintenance, machine tools, drawings, and tables

Before performing any internal maintenance work on a diesel engine, which sequence of actions is required?

  1. A. Reduce load to idle, isolate fuel, engage turning gear
  2. Stop the engine, cool it, isolate starting air and fuel, and engage the turning gearCorrect
  3. C. Isolate starting air, engage turning gear, then allow the engine to coast to a stop
  4. D. Shut down fuel, lock out the throttle, and post a watch at the throttle station

Why B is correct

NAVEDTRA 14075 §3-1 specifies that before any internal work the engine is stopped, cooled, the starting air and fuel are isolated, and the turning gear is engaged so it cannot roll. The other options omit one or more of these required steps.

More Maintenance, machine tools, drawings, and tables questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Before performing any internal maintenance work on a diesel engine,… — USCG Exam Practice · CaptainsGround