According to 46 CFR, where must the neutral of a grounded generation and distribution system be grounded?
- A. At the emergency switchboard
- ✓ At the generator switchboardCorrect
- C. At the main distribution panel
- D. At the load center nearest the generator
Why B is correct
46 CFR §111.05-17(a) requires the neutral of each grounded generation and distribution system to be grounded at the generator switchboard. The emergency system is a specific exception with different requirements.
Cited:46 CFR §111.05-17