Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticeMotor controllers and remote control

Under 46 CFR §111.70-7, from which point must the potential for a control, interlock, or indicator circuit normally be derived?

  1. A. The line side of the motor and controller disconnect device
  2. The load side of the motor and controller disconnect deviceCorrect
  3. C. An independent transformer dedicated to control circuits
  4. D. The ship's emergency switchboard

Why B is correct

46 CFR §111.70-7(c) requires that the potential for a control, interlock, or indicator circuit be derived from the load side of the motor and controller disconnect device. Derivation from the line side is only permitted under specific conditions described in §111.70-7(d) when control functions make the load-side arrangement impracticable.

More Motor controllers and remote control questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Under 46 CFR §111.70-7, from which point must the potential for a c… — USCG Exam Practice · CaptainsGround