Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticeLine handling and mooring

According to 33 CFR §164.74, if inspection records for a towline lapse for three months or more (and the vessel has not been laid up or out of service), what action is required?

  1. A. The towline must be replaced with a new one of equal or greater breaking strength
  2. The owner, master, or operator must retest the towline or remove it from serviceCorrect
  3. C. A class society must be engaged to conduct a full structural survey of the towing gear
  4. D. The towline may remain in service provided a visual inspection is conducted immediately

Why B is correct

33 CFR §164.74(a)(3)(v) states that once inspection records lapse for three months or more, except when a vessel is laid up, out of service, or has not deployed its towline, the owner, master, or operator shall retest the towline or remove it from service.

More Line handling and mooring questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

According to 33 CFR §164.74, if inspection records for a towline la… — USCG Exam Practice · CaptainsGround