Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticeLube oil and fuel oil systems

Under 46 CFR, what minimum pipe schedule is required for all discharge piping from fuel oil service pumps to burners?

  1. A. Schedule 40
  2. B. Schedule 60
  3. Schedule 80Correct
  4. D. Schedule 160

Why C is correct

46 CFR §56.50-65(a) requires all discharge piping from fuel oil service pumps to burners to be seamless steel with a thickness of at least Schedule 80. Schedule 40 and 60 are lighter walls that do not meet this requirement; Schedule 160 exceeds the minimum but is not the stated standard.

More Lube oil and fuel oil systems questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Under 46 CFR, what minimum pipe schedule is required for all discha… — USCG Exam Practice · CaptainsGround