Per 46 CFR §56.50-15, in a multiple boiler installation, each boiler's main, auxiliary, and desuperheater steam lines must be fitted with two valves. Which combination of valves is required?

  1. A. Two stop valves
  2. One stop valve and one stop check valveCorrect
  3. C. One stop check valve and one relief valve
  4. D. One stop valve and one sentinel valve

Why B is correct

46 CFR §56.50-15(d) requires that in multiple boiler installations, each boiler's main, auxiliary, and desuperheater steam lines be fitted with two valves: one stop valve and one stop check valve. Two stop valves, or combinations including relief or sentinel valves, do not satisfy this specific requirement.

More Auxiliary machinery and shipboard systems questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Per 46 CFR §56.50-15, in a multiple boiler installation, each boile… — USCG Exam Practice · CaptainsGround