Skip to main content
CaptainsGround
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer
USCG Exam PracticeAuxiliary machinery and shipboard systems

In a multiple boiler installation, each boiler's main, auxiliary, and desuperheater steam lines must be fitted with two valves. Which combination of valves is required?

  1. A. Two stop valves
  2. One stop valve and one stop check valveCorrect
  3. C. One stop check valve and one relief valve
  4. D. One gate valve and one globe valve

Why B is correct

46 CFR §56.50-15(d) requires that in multiple boiler installations, each boiler's main, auxiliary, and desuperheater steam lines be fitted with two valves: one stop valve and one stop check valve. This arrangement prevents backflow from the steam header into a secured boiler.

More Auxiliary machinery and shipboard systems questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

In a multiple boiler installation, each boiler's main, auxiliary, a… — USCG Exam Practice · CaptainsGround