Under 46 CFR §58.30-20, hose assemblies installed in a fluid power system must NOT be subjected to which condition under any circumstances?

  1. A. Lengths greater than required for flexibility
  2. Torsional deflection (twisting)Correct
  3. C. Installation between two points of relative motion
  4. D. Gradual bends along the hose run

Why B is correct

46 CFR §58.30-20(c) states that hose assemblies must not be subjected to torsional deflection (twisting) under any conditions of operation. Installation between points of relative motion is explicitly permitted. Excessive length is discouraged but not absolutely prohibited where operationally required. Gradual bends are acceptable; only sharp bends are to be avoided per §58.30-20(d).

More Hydraulics and pneumatics questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Under 46 CFR §58.30-20, hose assemblies installed in a fluid power… — USCG Exam Practice · CaptainsGround