Skip to main content
CaptainsGround

USCG Documented Vessel

ANOTHER CHANGE ORDER

No. 1280038RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1280038
Hull ID (HIN)
FGQ8C066A303Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
2003

Dimensions & tonnage

Length
37.7 ft
Breadth
10.7 ft
Depth
6 ft
Gross tonnage
16 GT
Net tonnage
16 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
December 26, 2023
Expires
January 31, 2029
Endorsements
Recreation

Builder

Builder
Fountain Powerboats INC
Built at
Washington, Nc, United States
Year built
2003
All vessels by this manufacturer (MIC FGQ) →

Hailing port

Hailing port
Sandusky, Oh, United States
Managing owner location
Mogadore, Oh

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Another Change Order — USCG Documented Vessel 1280038 · CaptainsGround