Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1255889Passenger (Uninspected)Valid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1255889
Hull ID (HIN)
SXJ01584D415Decode this HIN →
Flag
Us
Service
Passenger (Uninspected)
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
2014

Dimensions & tonnage

Length
39 ft
Breadth
11 ft
Depth
5.8 ft
Gross tonnage
16 GT
Net tonnage
16 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
April 16, 2026
Expires
April 30, 2027
Endorsements
Recreation

Builder

Builder
Ram Investments Of South Fl INC
Built at
Miami, Fl, United States
Year built
2014
All vessels by this manufacturer (MIC SXJ) →

Hailing port

Hailing port
Tierra Verde, Fl, United States
Managing owner (company)
Lines And Tines LLC
Managing owner location
Lutz, Fl

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1255889 · CaptainsGround