Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1103501RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1103501
Hull ID (HIN)
TNRD9376C000Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
2000

Dimensions & tonnage

Length
38.2 ft
Breadth
8.5 ft
Depth
4.9 ft
Gross tonnage
10 GT
Net tonnage
8 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
May 2, 2024
Expires
May 31, 2027
Endorsements
Recreation

Builder

Builder
Porter INC
Shipyard
Porter INC
Built at
Decatur, In, United States
Year built
2000
All vessels by this manufacturer (MIC TNR) →

Hailing port

Hailing port
Beach Haven West, Nj, United States
Managing owner location
Cinnaminson, Nj

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1103501 · CaptainsGround