Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1312549RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1312549
Hull ID (HIN)
VHS39A0AD819Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
2018

Dimensions & tonnage

Length
39.9 ft
Breadth
11.5 ft
Depth
6 ft
Gross tonnage
18 GT
Net tonnage
18 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
January 18, 2022
Expires
January 31, 2027
Endorsements
Recreation

Builder

Builder
Hydrasports Custom Boats LLC
Built at
Vonore, Tn, United States
Year built
2018
All vessels by this manufacturer (MIC VHS) →

Hailing port

Hailing port
Lighthouse Point, Fl, United States
Managing owner location
Lighthouse Point, Fl

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1312549 · CaptainsGround