Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1348298RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1348298
Hull ID (HIN)
YSIR0029H324Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
2023

Dimensions & tonnage

Length
31.8 ft
Breadth
9.8 ft
Depth
6.3 ft
Gross tonnage
13 GT
Net tonnage
13 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
August 7, 2024
Expires
August 31, 2029
Endorsements
Recreation

Builder

Builder
Seminole Marine INC
Built at
Cairo, Ga, United States
Year built
2023
All vessels by this manufacturer (MIC YSI) →

Hailing port

Hailing port
Gulf Shores, Al, United States
Managing owner location
Gulf Shores, Al

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1348298 · CaptainsGround