Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 934297RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
934297
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
1987

Dimensions & tonnage

Length
42.7 ft
Breadth
14 ft
Depth
7.9 ft
Gross tonnage
31 GT
Net tonnage
25 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
April 30, 2026
Expires
April 30, 2031
Endorsements
Recreation

Builder

Builder
Sea Ray Boats INC
Shipyard
Sea Ray Boats, INC.
Built at
Palm Coast, Fl, United States
Year built
1987

Hailing port

Hailing port
Seattle, Wa, United States
Managing owner location
Seattle, Wa

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 934297 · CaptainsGround