Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1046397RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1046397
Hull ID (HIN)
XYU5048SG697Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Monohull
Year built
1996

Dimensions & tonnage

Length
48 ft
Breadth
16.2 ft
Depth
7.5 ft
Gross tonnage
39 GT
Net tonnage
31 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
October 1, 2025
Expires
October 31, 2030
Endorsements
Recreation

Builder

Builder
Ocean Yachts INC
Shipyard
Ocean Yachts INC
Built at
Weekstown, Nj, United States
Year built
1996
All vessels by this manufacturer (MIC XYU) →

Hailing port

Hailing port
Palm Beach, Fl, United States
Managing owner location
Burlington, Ky

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1046397 · CaptainsGround