Skip to main content
CaptainsGround

USCG Documented Vessel

CRITICAL PATH

No. 1359999RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1359999
Hull ID (HIN)
IVBC0473A324Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Frp (Fiberglass)
Hull shape
Twin Hull
Year built
2024

Dimensions & tonnage

Length
35.8 ft
Breadth
11.7 ft
Depth
5.8 ft
Gross tonnage
10 GT
Net tonnage
10 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
September 17, 2025
Expires
September 30, 2030
Endorsements
Recreation

Builder

Builder
Invincible Boat Company
Built at
Opa Locka, Fl, United States
Year built
2024
All vessels by this manufacturer (MIC IVB) →

Hailing port

Hailing port
San Diego, Ca, United States
Managing owner location
Encinitas, Ca

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Critical Path — USCG Documented Vessel 1359999 · CaptainsGround