A watchstander needs to open a valve on a steam line to restore flow to an auxiliary. Which sequence correctly reflects the safety requirements before opening the valve?
- ✓ Verify the line is isolated, depressurized, cooled, and tagged out as required, then open the valveCorrect
- B. Don hearing protection and gloves, then crack the valve slowly to bleed off pressure
- C. Notify the watch engineer, then open the valve while another watchstander monitors the pressure gauge
- D. Confirm the system is in the plant lineup and open the valve at normal operating pressure
Why A is correct
NAVEDTRA 14104 §1-2 requires that before opening any pressurized system, valve, or casing, the watchstander verifies it is isolated, depressurized, cooled, and, where required, tagged out. Opening a steam valve at operating pressure without isolation and depressurization is a serious burn and injury hazard.
Cited:NAVEDTRA 14104 §1-2