Per 46 CFR §111.15-25, for a large storage battery installation, where must the overcurrent protective devices be located?

  1. A. Inside the battery room, adjacent to each battery
  2. B. At the main switchboard, regardless of distance from the battery room
  3. Next to, but outside of, the battery roomCorrect
  4. D. At the battery charger output terminals

Why C is correct

46 CFR §111.15-25(a) specifies that for large storage battery installations, overcurrent protective devices must be next to, but outside of, the battery room. Placing them inside the battery room or at a remote switchboard does not meet this requirement.

More Batteries and storage systems questions

Start drilling in 30 seconds. Free.

No signup, no credit card — answer 5 real, cited exam questions right now.

Per 46 CFR §111.15-25, for a large storage battery installation, wh… — USCG Exam Practice · CaptainsGround