Between fixes, when only current can be estimated, the best available position is the ______.

  1. A. DR position advanced from the last fix
  2. estimated position corrected for set and driftCorrect
  3. C. fix interpolated from adjacent LOPs
  4. D. DR position corrected for leeway only

Why B is correct

Bowditch Ch. 8 §803 states the EP is the best position available between fixes when only the current can be estimated. The DR position alone does not account for current.