The vertical clearance of a bridge charted on a US chart is referenced to which datum?

  1. A. Mean Higher High Water (MHHW)
  2. B. Mean Lower Low Water (MLLW)
  3. Mean High Water (MHW)Correct
  4. D. Mean Sea Level (MSL)

Why C is correct

Bowditch Ch. 9 §904 specifies that heights of features such as bridges and lights are referenced to Mean High Water, which means vertical clearance decreases as the tide rises toward MHW.