Skip to main content
CaptainsGround

USCG Documented Vessel

CHANGE ORDER

No. 1364561RecreationalValid
Data as of · Source: U.S. Coast Guard
Every answer cited & verifiedAll 4 USCG exam modulesReviewed by a former NMC exam writer

Vessel particulars

Official number
1364561
Hull ID (HIN)
EZXX7556I526Decode this HIN →
Flag
Us
Service
Recreational
Self-propelled
Yes
Hull material
Aluminum
Hull shape
Monohull
Year built
2025

Dimensions & tonnage

Length
34 ft
Breadth
9.5 ft
Depth
4.8 ft
Gross tonnage
10 GT
Net tonnage
10 NT

Documentation

A Certificate of Documentation (COD) is the U.S. Coast Guard’s federal record of a vessel’s nationality and ownership — a national alternative to state titling for eligible vessels. Learn how it differs from state registration in the registration vs documentation guide.

COD status
Valid
Issued
April 6, 2026
Expires
April 30, 2031
Endorsements
Recreation

Builder

Builder
Renaissance Marine Group INC
Built at
Clarkston, Wa, United States
Year built
2025
All vessels by this manufacturer (MIC EZX) →

Hailing port

Hailing port
Everett, Wa, United States
Managing owner location
Arlington, Wa

Planning to run this boat as a charter or take paying passengers? Carrying up to six for hire needs an OUPV “six-pack” captain’s license.

Was this page helpful?

Independent reference tool — not affiliated with, endorsed by, or sponsored by the U.S. Coast Guard or the National Maritime Center. Vessel data is derived from public USCG sources and may lag official records; always verify with the issuing authority.

Study the exam the way it's actually written.

Every question cited to 33/46 CFR, the COLREGs, and Bowditch. Try 5 free — no signup.

Change Order — USCG Documented Vessel 1364561 · CaptainsGround